
5-31 Construction #7
June 3, 2013
Future retail facility

Future retail facility

Coming soon!!

5-31 Inside the production facility

5-31 Inside the production facility

We are working on a game plan to produce the BEST wine we can possibly make for our consumers; something that we can be proud of and excited about. (Yes, I know, I know — never end a sentence with a preposition. “Something of which we can be proud and something about which we can be […]

Pouring concrete for the production facility

Pouring the concrete for the production facility

Pouring the concrete in the production facility

Pouring the concrete in the production facility